Member Login
Search
Jump to a Date
Sponsored Communities
Cool stuff
Neat Stuff

Visit our shop for nerds in control lifestyle products.
Thermal Overload
The threads that wouldn't die...
- PC reliability?
- Windows, real time
- PID loops
- PCs vs. PLCs
- Replacing people
- MS 'monopoly'?
- Software quality
- Where do we go from here?
- Why pay?
- PC reliability?
- Windows, real time
- PID loops
- PCs vs. PLCs
- Replacing people
- MS 'monopoly'?
- Software quality
- Where do we go from here?
- Why pay?
Fortune
"Really ?? What a coincidence, I'm shallow too!!"
RSS Feed
www.control.com/rss/
To get a personalized feed, become a member at no cost.
Posts from...
Friday, November 30, 2007MKV Cores Not at A7 status
New Replies:
By Danno on 30 November, 2007 - 1:22 am -
By Danno on 30 November, 2007 - 1:22 am -
I have the GEH-6195B, GEH-5982, GEH-5992, and GEH-5981 manuals.
I do not have the 5980 or 5979...
By CSA on 30 November, 2007 - 1:00 am - Okay, I'm kinda confused here with this reply, but it is nice to see that there is someone from the...
Explanation of so called test position of a drive
DHCP AGENT RELAY option 82 on Premium?
Info on AEES inverters
New Replies:
By turbinectech on 30 November, 2007 - 1:15 am -
By turbinectech on 30 November, 2007 - 1:15 am -
Our primary inverter is a MOS 125-230/240-1500-60HZ unit with a static bypass switch. We have...
What is the power supply requirement for a Mark 6 control system?
PLC to Pc data cable schematic
New Replies:
By Mesquita on 30 November, 2007 - 1:11 am -
By Mesquita on 30 November, 2007 - 1:11 am -
I can't find the pinout of the cable. Can you send me the pinout for de MiniDIN and DB9?
Thanks...
I would like to get details on DCS Yokogawa training in Banglore.
New Replies:
By Aiswarya K.S on 30 November, 2007 - 1:10 am -
By Aiswarya K.S on 30 November, 2007 - 1:10 am -
Greetings...
I am a 3rd year (5th semester) student of Amrita School Of Engineering, Bangalore....
I was referred over here from www.MrPLC.com. We are developing a PC application in C/C++ and need to communicate to one or more Omron PLCs (CJ1M CPU12).
New Replies:
By Michael Batchelor on 30 November, 2007 - 1:06 am -
By Michael Batchelor on 30 November, 2007 - 1:06 am -
I have to say that I have been singing this same song for a number of years. It's easy enough to...
By Nathan Boeger on 30 November, 2007 - 12:49 am - Michael,
Some of my comments were to backfill you guys on OP's original post on another forum -...
I had made redundancy in ControlLogix on hardware side but facing problem on software side
How should I configure SCADA and RSLINX to work together in order to get data from SLC 500 PLC?
New Replies:
By Bob Peterson on 30 November, 2007 - 12:55 am -
By Bob Peterson on 30 November, 2007 - 12:55 am -
RSLinx Lite does not have an OPC server built in. You would probably need to purchase a version...
By Michael Batchelor on 30 November, 2007 - 12:31 am - You need RSLinx Pro or RSLinx OEM or RSLinx Gateway (Or maybe some new name Rockwell has come up...
I want to calculate the size of the cable to be used for earthing for 11 kv having a short circuit current of 25 ka and then above 25 ka.
I need ECAD software of commercial standard excluding Multisim 8 review. I am looking for information about this software.
Rockwell interchange software library not available for HP Itanium process based server. Because of this, when we compile our source code on this new server we face ELF error for this symbolic file.
Intermittent fluctuations of CPD
New Replies:
By B.E on 30 November, 2007 - 12:12 am -
By B.E on 30 November, 2007 - 12:12 am -
Thanks for your reply,
The panel is TMR. The diagnostic alarm is being generated intermittently...
We are in the middle of design for one of the most complex fish hatcheries ever to be built in North America. Our engineering consultant is recommending standard PLC and SCADA alarm and control system but one of our staff is really pushing a WinPLC based system...
New Replies:
By Nathan Boeger on 30 November, 2007 - 12:10 am -
By Nathan Boeger on 30 November, 2007 - 12:10 am -
Victor - respectfully,
1. PCs do crash routinely compared to PLCs. They are not designed to...
Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2008 Control Technology Corporation. All rights reserved.
Our Advertisers
Help keep our servers running...
Patronize our advertisers!
Patronize our advertisers!









