Member Login
member
passwd
remember me on this computer.

- join now -

Search

Neat Stuff

Visit our shop for nerds in control lifestyle products.

Cool stuff
Select a topic of interest:
...and press:
Fortune
I'm shaving!! I'M SHAVING!!
RSS Feed
RSS feed Use this link to get an RSS feed of the Control.com article flow, for private, non-commercial use only:
www.control.com/rss
Select a Page Style
Select one of the following styles:
- BluFu
- Classic
(cookies required)
Posts from...
Sunday, May 11, 2008
from the Operations department...
Electrical & Ladder logic drawing study
Information topic
Posted by sunny on 11 May, 2008 - 7:55 pm
how to study basic Electrical, schematic & Ladder logic drawings (related to Markiv system)?
from the Automation List department...
modbus master IC?
Communications topic
Posted by rik on 11 May, 2008 - 7:54 pm
So I would like a chip/embedded code to create a modbus master, from which I can just collect the data from a modbus slave...
Engineering topic
Posted by rk on 11 May, 2008 - 7:53 pm
3150KVA 33/11KV Star delta transformer...
from the Automation List department...
LFBV Calibration
Applications topic
Posted by SI1405 on 11 May, 2008 - 7:53 pm
Calibrating out incorrect stroke length of Liquid fuel bypass valve.
from the Automation List department...
RE: Hazardous Classification
Engineering topic
Reply posted by Bruce Durdle on 11 May, 2008 - 7:51 pm
EExe/EExd
from the Central Engineering department...
Re: PLC vrs. DCS for air compressor control
Process Control topic
Reply posted by cap-man on 11 May, 2008 - 7:51 pm
What is the industry prefered option for Air compressor control platform? DCS or PLC?
from the Automation List department...
Re: ge gas turbine frame 9 e
Engineering topic
Reply posted by CSA on 11 May, 2008 - 7:49 pm
if the turbine trips suddenly, it is to be kept on turning gear within 15mts...
from the Automation List department...
Re: CSP.PRN file creation in IDOS
HMI topic
Reply posted by CSA on 11 May, 2008 - 7:48 pm
CSP.PRN file creation in the IDOS computer
from the Electrical department...
Re: Phase to earth current flow in Delta
Engineering topic
Reply posted by rajendra on 11 May, 2008 - 7:46 pm
Why current flow from phase to earth with delta?
from the Automation List department...
Re: Fault Tolerant Ethernet and Industrial Ethernet,
PLCs topic
Reply posted by dchartier on 11 May, 2008 - 1:03 pm
Difference between a Fault Tolerant Ethernet and Industrial Ethernet,
from the Central Engineering department...
PLC vrs. DCS for air compressor control
Process Control topic
Posted by saeed on 11 May, 2008 - 1:03 pm
What is the industry prefered option for Air compressor control platform? DCS or PLC?
from the Automation List department...
Re: help with RS285 serial port
Communications topic
Reply posted by Heinz-Jurgen_Oertel on 11 May, 2008 - 1:02 pm
information about RS285
from the Automation List department...
Re: help with RS285 serial port
Communications topic
Reply posted by dchartier on 11 May, 2008 - 1:01 pm
information about RS285
from the Automation List department...
Re: CSP.PRN file creation in IDOS
HMI topic
Reply posted by Brian on 11 May, 2008 - 12:56 pm
CSP.PRN file creation in the IDOS computer
from the operations department...
ge gas turbine frame 9 e
Engineering topic
Posted by ge on 11 May, 2008 - 12:53 pm
if the turbine trips suddenly, it is to be kept on turning gear within 15mts...
from the Process Control department...
Re: DCS Factory Acceptance Test (FAT)
Process Control topic
Reply posted by Muhammad on 11 May, 2008 - 12:49 pm
What is the procedure to carry out Factory Acceptance Test (FAT) & Site Acceptance Test (SAT) of DCS panel?
from the Process Control department...
Re: DCS Factory Acceptance Test (FAT)
Process Control topic
Reply posted by C Potdar on 11 May, 2008 - 12:48 pm
What is the procedure to carry out Factory Acceptance Test (FAT) & Site Acceptance Test (SAT) of DCS panel?
from the Automation List department...
Re: Hazardous Classification
Engineering topic
Reply posted by C Potdar on 11 May, 2008 - 12:48 pm
EExe/EExd
from the Automation List department...
Re: Advance Process Control in Foundation Fieldbus
Process Control topic
Reply posted by steve orton on 11 May, 2008 - 12:47 pm
Fieldbus Control Philosophy...
from the Control the Uncontrollable department...
Re: Temp control with large dead time
Process Control topic
Reply posted by cap-man on 11 May, 2008 - 12:46 pm
Trying to control a temperature loop with a 6 minute delay between control action (Output) and when any PV (MV) change is noticed.
from the Do or Not Do department...
Grounding
Engineering topic
Posted by Steve Orton on 11 May, 2008 - 12:45 pm
Do you hook your grounds to the backplate?
from the Automation List department...
Re: supervisory system for 30 UDC 3000
Software in Automation topic
Reply posted by jknight on 11 May, 2008 - 12:43 pm
see the problem is that in the manual says that the Rs485/422 link is limited to 16 controller...
Engineering topic
Posted by Ahmad HOUHOU on 11 May, 2008 - 12:42 pm
Communication with IQDATA PLUS relays through MINT from Cutler-Hammer
Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2008 Control Technology Corporation. All rights reserved.

Users of this site are benefiting from open source technologies, including PHP, PostgreSQL and Apache. Be happy.

Advertisement
Our Advertisers
Help keep our servers running...
Patronize our advertisers!