Member Login
member
passwd
remember me on this computer.

- join now -

Search

Neat Stuff

Visit our shop for nerds in control lifestyle products.

Cool stuff
Select a topic of interest:
...and press:
Fortune
Birthdays are like busses, never the number you want.
RSS Feed
RSS feed Use this link to get an RSS feed of the Control.com article flow, for private, non-commercial use only:
www.control.com/rss
Select a Page Style
Select one of the following styles:
- BluFu
- Classic
(cookies required)
Posts from...
Monday, September 1, 2008
from the ALLEN BRAIDLEY department...
MODBUS FOR PLUS II AB
Communications topic
Posted by DIANA HERRERA on 1 September, 2008 - 2:14 pm
Is modbus protocol available on the Variable Frequency Plus II?
from the Automation List department...
Re: RSView32 Dual Monitors
HMI topic
Reply posted by Roy Matson on 1 September, 2008 - 11:33 am
How do I run one application of RSView32 with two monitors?
from the fire & gas department...
Re: smoke detector and PLC
Applications topic
Reply posted by chud on 1 September, 2008 - 11:31 am
how to wire smoke detector
from the Libnodave department...
Compiling libnodave
PLCs topic
Posted by NØ on 1 September, 2008 - 11:30 am
How to compile libnodave within developer studio 2005.
from the Instrument department...
Re: Level Transmitter False Reading
Engineering topic
Reply posted by Sandy on 1 September, 2008 - 11:29 am
Large variations are seen in the Level Transmitter installed on Ammonia service.
from the control and instrumentation department...
working of starting motor
Process Control topic
Posted by RAVIKUMAR G on 1 September, 2008 - 11:29 am
working of starting motor in governing system
from the Instrument department...
Re: Level Transmitter False Reading
Engineering topic
Reply posted by Bilal on 1 September, 2008 - 11:28 am
Large variations are seen in the Level Transmitter installed on Ammonia service.
from the maintenance department...
transformer selection
Motion Control topic
Posted by pk on 1 September, 2008 - 11:27 am
selecting criteria for transformer?
from the maintenance department...
Re: transformer primary current with reactor
Engineering topic
Reply posted by pk on 1 September, 2008 - 11:26 am
what is relation between primary current and reactor.
from the Automation List department...
Re: Load Rejection in ISOC mode
HMI topic
Reply posted by CSA on 1 September, 2008 - 11:23 am
During parallel operation, trip of another GT, enabled the load pick up in GT with mark V. Soon this GT start rejecting the load with speed dropping.
from the Automation List department...
Re: MKV Enumerated state command
Software in Automation topic
Reply posted by CSA on 1 September, 2008 - 11:22 am
Creating an enmurated state and adding to a user defined display
from the Instrumentation department...
Re: Auto change over from ISCHO to Droop mode
Engineering topic
Reply posted by Rajkumar on 1 September, 2008 - 11:20 am
When we started the compressor, GTG output frequency dropped down and it was automatically changed to Droop mode...
from the power generation department...
Re: Generating electricity using household water pressure
Applications topic
Reply posted by Robert Scott on 1 September, 2008 - 11:19 am
how can I generate 12 volts AC or DC using only household water pressure, and what is the smallest this generator can be? Can it be smaller than 120cc?
from the Electrical department...
Re: Bus Bar
Information topic
Reply posted by Rasam Syamsudin on 1 September, 2008 - 11:19 am
Bus bar calculation
from the Automation List department...
Re: Mark IV maintenance manual
Information topic
Reply posted by Bob Johnston on 1 September, 2008 - 11:17 am
Where can I get MarkIV maintenance manual?
from the Automation List department...
Re: Query about Frame 9E Gas Turbine with Mark IV Control
Engineering topic
Reply posted by CSA on 1 September, 2008 - 11:16 am
If we increase time delay for shutdown to 30 secs, fuel changeover valve would change position & there would be no shut down BUT m/c would run on furnace oil without additive dosing for approx. 20 seconds...
from the Control department...
Re: Mark V HMI Hard disk failure
HMI topic
Reply posted by Bob Johnston on 1 September, 2008 - 11:14 am
How to replace a failed hard disk in a running Mark V unit?
from the Automation List department...
Re: Mark V HMI Hard disk failure
HMI topic
Reply posted by CSA on 1 September, 2008 - 11:14 am
How to replace a failed hard disk in a running Mark V unit?
Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2008 Control Technology Corporation. All rights reserved.

Users of this site are benefiting from open source technologies, including PHP, PostgreSQL and Apache. Be happy.

Advertisement
Our Advertisers
Help keep our servers running...
Patronize our advertisers!