Select Page: 1
Control.com member...
Member Information and Posts by Mohamed1970IN GE mark 6
why Temp matching must be done at TNR 100.4 and 100.5
and what meaning her TNR (speed referance )
and this valve change without changing the speed
why Temp matching must be done at TNR 100.4 and 100.5
and what meaning her TNR (speed referance )
and this valve change without changing the speed
the unit give alarm on the HMI and not give alarm in alarm event
New Replies:
> Can you please provide the frame size for your GT? The equation that you have
> stated...
power Gen is controlled by MRK6 (6fA) tripped many times due to lube hider
New Replies:
Dear sir
thank you for your reply.
Y has Diag alarm so we swap the X, y and replace the TREG...
Please see
http://www.speedyshare.com/files/30491755/event_log2.doc...
before the first trip
the Hyd pump A is trip due to mech problem and it now is out...
After an outage of the MKV unit, I have a problem with DW signal. It is a negative value now. I was working on generator current signal during the outage and replaced ribbon cable (JV) and PTBA card.
Select Page: 1
Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2013 Nerds in Control, LLC. All rights reserved.
Users of this site are benefiting from open source technologies, including PHP, MySQL and Apache. Be happy.
Fortune
The trouble with being punctual is that people think you have nothing
more important to do.







