K
Last outage we intended to do waterwash but failed dismally. Nothing would work. Is there any pre start checks that we can perform on our next one? Our outage will begin 4th Oct-15th Oct.
| Thread starter | Similar threads | Forum | Replies | Date |
|---|---|---|---|---|
| M | Swirl effect in gas turbine GE frame 9FA | Power Generation | 2 | |
| A | Lube oil filter on GE Frame 9FA | Power Generation | 1 | |
| M | GE gas turbine frame 9FA LFBV calibration procedures | Power Generation | 9 | |
| R | cold fuel gas temp control valve frame 9FA | Power Generation | 1 | |
| D | GE Frame 9FA | Power Generation | 0 |