D
Trying to configure logic for lead/lag for 2 pumps (P1, P2,), and need to develop a logic diagram. Low Level to Switch to shutdown pumps P1 and P2. And pump to Auto-Start on Primary Pump failure. Please, let me know of a goby I can use for this configuration.
Thanks!
Thanks!
