My company uses Mark IV to control Gas Turbine Generator (GTG). It's often got trip caused by Unit Auxiliary Transformer (UAT) when the unit goes online.
The power plant was built by two different vendors, General Electric and Bailey. Both of them have their own wiring diagram. I found some difficulties on matching these two diagrams. Also I would like you to give me some advice about the causes of this trip problem and possible things I can do to solve this problem. Thanks.
nanang
(Instrument Engineer)
The power plant was built by two different vendors, General Electric and Bailey. Both of them have their own wiring diagram. I found some difficulties on matching these two diagrams. Also I would like you to give me some advice about the causes of this trip problem and possible things I can do to solve this problem. Thanks.