S
Hi guys!
this is my first post and i really expect some very healthy and positive helpful responses. My question is a very interesting one..
There is a chemical plant running from 1995. When it starts operation, they developed DCS system in order to monitor and control the plant operations. DeltaV for PROVOX is the system they are working on. They have sensors/actuators at the lowest level, they goto I/O racks, which go to SRx controllers. These SRx controllers get connected with Data Highway II then HDL-6 is used as an interface between Data Highway and the DOP server and then thru ethernet, the information is transferred to operator's consoles.
Remember that their sensors working on 4-20mA and RS485 protocols.
if they want more functionality or in simpler words if they want to move towards a better controlling network, what is the best option available to upgrade this DCS system keeping in mind that the plant operations must not be shut down. ?? SHould we go for Foundation Bus, Profi Bus or HART???
The plant managment will surely like to work on the solution that can make use of their existing structure and provide them with greater benefits.
Plz give ur opinions..
this is my first post and i really expect some very healthy and positive helpful responses. My question is a very interesting one..
There is a chemical plant running from 1995. When it starts operation, they developed DCS system in order to monitor and control the plant operations. DeltaV for PROVOX is the system they are working on. They have sensors/actuators at the lowest level, they goto I/O racks, which go to SRx controllers. These SRx controllers get connected with Data Highway II then HDL-6 is used as an interface between Data Highway and the DOP server and then thru ethernet, the information is transferred to operator's consoles.
Remember that their sensors working on 4-20mA and RS485 protocols.
if they want more functionality or in simpler words if they want to move towards a better controlling network, what is the best option available to upgrade this DCS system keeping in mind that the plant operations must not be shut down. ?? SHould we go for Foundation Bus, Profi Bus or HART???
The plant managment will surely like to work on the solution that can make use of their existing structure and provide them with greater benefits.
Plz give ur opinions..