I (we) am collecting information to develop a business model for our clients (investors). I do not have great knowledge about power generation. We need to harness flare gas by connecting crude oil fields to gas power stations. We need the technical computation based on the questions below in other to evaluate how much we can make out of an oil field. We estimated that an oil field can generate about 80M scf/day of natural gas (correct?). We are considering using the GE Jenbacher Gas turbines with max rating of 4.4 MW. My questions are:
-How many Gas turbines do we need to absorb the 80 Mio scf/d (is our assumption of 80Mscf/day correct?).
-What is the volume of gas needed at full capacity of the 4.4 Mw?
-What is the maximum flow rate of gas of the engines?
-What is the volume of Kwh max produce in one days per a 4.4? 106 Mwh par jour is that correct?
-What is the cost of the such engine?
-What is the cost of the yearly maintenance support?
-What is the cost of connecting the turbine to the gas pipe?
-What are the cost we should think about for running such a project?
-What are the waste rejected by the engine after- “combustion I suppose"
It would be most appreciated if this forum can help me.
[email protected]
-How many Gas turbines do we need to absorb the 80 Mio scf/d (is our assumption of 80Mscf/day correct?).
-What is the volume of gas needed at full capacity of the 4.4 Mw?
-What is the maximum flow rate of gas of the engines?
-What is the volume of Kwh max produce in one days per a 4.4? 106 Mwh par jour is that correct?
-What is the cost of the such engine?
-What is the cost of the yearly maintenance support?
-What is the cost of connecting the turbine to the gas pipe?
-What are the cost we should think about for running such a project?
-What are the waste rejected by the engine after- “combustion I suppose"
It would be most appreciated if this forum can help me.