H
We have an old ABB IHM system MV850 (2 units) which are connected to a MB300 control network. We have also 19 MP200 and 1 AC450 in this MB300 network. We wish to replace these MV850 units and install another SCADA package, but keeping MP200, AC450 and MB300. The problem is how to collect about 13000 process data and make them available for monitoring and operation?
As we know, if we use ABB advant system and MB300 network, we have to use RTA board from ABB to collect real time data from that network. We are interested in the OPC solution. In this case does any body know about the use of RTA board to collect data and working with another IHM system (not using ABB OperateIT HMI)? How we can do this? What performance we can reach using this solution?
As we know, if we use ABB advant system and MB300 network, we have to use RTA board from ABB to collect real time data from that network. We are interested in the OPC solution. In this case does any body know about the use of RTA board to collect data and working with another IHM system (not using ABB OperateIT HMI)? How we can do this? What performance we can reach using this solution?