J
We have 6 bhel make gas turbine Mark-V operated, and 03 GTs are NP make of Frame-6. Out of 9 GTs, 4 are running with mixdc fuel (Liquid + Gas), liquid are LCO and Gas is Refinery fuel gas. Main problem is that in the last 2-3 months we have faced failure of Flow divider. We are running @25 MW load with 40% liquid and 60% gas. We are using additive SR-2008 winter grade for increasing lubricity of fuel.
