Member Login
member
passwd
remember me on
this computer.

- join now -
- forgot username or password? -

Search

Jump to a Date

Sponsored Communities
Cool stuff
Select a topic of interest:
...and press:
Neat Stuff
Control.com Stuff

Visit our shop for nerds in control lifestyle products.

Fortune
"There is hopeful symbolism in the fact that flags do not wave in a
vacuum."
-- Arthur C. Clarke
RSS Feed
RSS feed Use this link to get an RSS feed of the Control.com article flow, for private, non-commercial use only:
www.control.com/rss/
To get a personalized feed, become a member at no cost.
Select a Page Style
Select one of the following styles:
- BluFu
- Classic
(cookies required)
advertisement
from the operations department...
GE gas turbines water wash. in DLN gas turbines water wash should be done at base load
Power generation equipment control. topic
Posted by GE gas turbines on 23 October, 2008 - 5:05 am
In GE gas turbines DLN system water wash should be done at what load? Whether it is in base load or reduced load? Why?


Posted by ravi Kishore on 24 October, 2008 - 1:36 pm
In GE 7Fa we are doing online water wash at a reduced load approximately by 3%. Machine should be out of temperature control, transitioning to speed control. This is done to avoid peaking of the machine during the water washing.


Posted by ravi on 24 October, 2008 - 1:48 pm
I would like to add one more point that online washing should not be conducted when the Inlet bleed heat is open. This valve should not be forced to close to carry out the water wash.

Turbine should be in running condition and not to be in shutting down period.

IGVs preferably can be 3 to 4 deg less than full load (base load).


Posted by MIKEVI on 25 October, 2008 - 11:53 am
Dear GE Gas Turbines,
We perform an online rinse/wash to our GE7EA DLN 1.0 turbines daily. GE specifies that the online wash should be done at base load only with IGV's at maximum angle and IBH the inlet bleed heat valve closed. Keeping the IGV's at or near maximum angle reduces chances of water droplets hiding out in low pressure zones of the IGV blades and contributes to a better wash.

If you do not keep the unit on temp control you should watch your IGV angle, since you can expect a 3-5% rise in power output during a wash, which could cause the IGV's to close down in an attempt to maintain exhaust temperature. You do not specify the model of turbine you are using, but I can tell you that on the 7EA inlet bleed heat is closed with IGV angle greater than 61 deg, so IBH should never be a problem if the unit is at or near base load.

As a sidenote we have modified logic to monitor the secondary flame detector intensity and stop the wash if 2 flame detectors fall below a set threshold. We have noted in colder ambients that the increased moisture from the wash seems to fog over the flame scanners at times.


Posted by rk on 25 October, 2008 - 10:46 pm
It was the problem of fogging with some DLN systems. But in DLN 2.6 we did not face this problem.

However it was recommended by GE to reduce the load. It might be mentioned in your GE manual also to whether do the water wash at reduced load or at base load.

From Control Engineering magazine...
Related articles from Control Engineering magazine
Above articles copyright 2009 Reed Business Information. Subject to its Terms of Use.
Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2009 Control Technology Corporation. All rights reserved.

Users of this site are benefiting from open source technologies, including PHP, MySQL and Apache. Be happy.

Internet Explorer 6.0 Fix

Advertisement
Our Advertisers
Help keep our servers running...
Patronize our advertisers!