A 55Mw Steam turbine has problem with Diff. expansion. After turbo generator connected to electrical network and power start to increase. This parameter goes to negative value and the turbine will be tripped at -1mm (as it defined). so the width of turbine insulation was controlled, it is according installation instruction. the inlet steam temp. was controlled, the steam is super heated. the measuring instrument was be checked. it hasn't any problem. Normally the expansion of rotor must be greater than cylinder expansion, but at this unit it isn't happen. Please help me. Thanks
A 55Mw Steam turbine has problem with Diff. expansion. After turbo generator connected to electrical network and power start to increase. This parameter goes to negative value and the turbine will be tripped at -1mm (as it defined). so the width of turbine insulation was controlled, it is according installation instruction. the inlet steam temp. was controlled, the steam is super heated. the measuring instrument was be checked. it hasn't any problem. Normally the expansion of rotor must be greater than cylinder expansion, but at this unit it isn't happen. Please help me. Thanks