D
We carried out MI (2nd) on our frame6 GE gas Turbine. Also our control system is upgraded from Mark-IV to Mark VIe. We face problem of high wheelspace temperature (3rd stage forward-both FO1 & FO2). Also remaining temperatures had increased by @ 30 deg. Cent. what may be the reason for this.