K
we have instrumentation cables (2 pair to 24 pair twisted 0.5 sqmm size) in our power plant. there is a need to joint cable that got cut / damaged due to heat, as a temporary measure.
what is the practice followed in industry for jointing instrumentation cables? using tubular lugs or any better faster method is available?
what is the practice followed in industry for jointing instrumentation cables? using tubular lugs or any better faster method is available?