We are in process of up-grading MARK-II to MARK-VIe control system on our Frame-5 (25MW) gas turbine. Currently MARK-II control system is installed on this turbine. We are procuring MARK-VIe separate Marshaling and system cabinet now. MARK-II system cabinet is currently installed in local compartment.
We are inclined to install MARK-VIe marshaling cabinet in area compartment and re-locate MARK-VIe system cabinet in Central Control Room which is 180 meter away from GTG local compartment. In this case we have to lay additional cables from GTG compartment to rack room with larger job scope.
What are point of concerns in this prototype? Any body with such an experience?
Thanks & Regards,
Adeel
We are inclined to install MARK-VIe marshaling cabinet in area compartment and re-locate MARK-VIe system cabinet in Central Control Room which is 180 meter away from GTG local compartment. In this case we have to lay additional cables from GTG compartment to rack room with larger job scope.
What are point of concerns in this prototype? Any body with such an experience?
Thanks & Regards,
Adeel