Hello everyone...
I am working on gas turbine operation (19.6 MW, frame-V, GE make turbine, Brush make Alternator). I would like to know what are the MINIMUM turbine parameters which are to be monitored by us to keep our turbine healthy (log sheet is too huge to monitor) along with its set points.
Thanks and regards
I am working on gas turbine operation (19.6 MW, frame-V, GE make turbine, Brush make Alternator). I would like to know what are the MINIMUM turbine parameters which are to be monitored by us to keep our turbine healthy (log sheet is too huge to monitor) along with its set points.
Thanks and regards