Mark V Control Sequence
Originally posted by Denice Thomas on 24 January, 2010 - 1:45 am
Understanding Mark V Control Sequence
New Replies:
But in control sequence document point 'B' is named as pick up point, but you say it comes into...
Thank you very much......
14HR will become TRUE on decreasing speed when the shaft speed drops below setpoint 'B' and will...
Topic: Power generation equipment control.
from the instrumentation department...
SVO1 hunting in R core
Originally posted by tclmarkv on 26 January, 2010 - 12:46 am
Hunting in R core SRV output
New Replies:
thanks a lot CSA for your detailed reply,pls find some of our observations with reference to your...
Excellent CSA, keep it up your good work....
The most important question is: What changed before this problem started? Was there some kind of...
Topic: Power generation equipment control.
from the Generation department...
What is FSR
Originally posted by eurydice on 26 January, 2010 - 10:37 pm
With reference to MArk V, what is the meaning of FSR?
New Replies:
FSR means "Fuel Stroke Reference" and is related to fuel control valve stroke (GCV on gas...
Topic: Power generation equipment control.
from the Electrical department...
pf variation
Posted by anand on 27 January, 2010 - 9:18 am
we have two synchronised turbogenerator of 16.5 and 20 MW each with unitrol 1000 and F avr and running on.93 and .93 pf. we are observing that all of a sudden pf become unbalance in the order of .97 and .88.
Topic: Power generation equipment control.
from the electrical department...
synchronised turbogenerators power factor
Posted by ANAND on 27 January, 2010 - 9:06 am
what are the effect on generatorsand system if one of the generator goes in leading region.
Topic: Engineering and workplace issues.
from the Electrical department...
3 Phase transformer neutral
Originally posted by Hussain on 20 January, 2010 - 2:53 am
Can i connect Neutral to ground directly or use resistance in transformer
New Replies:
Dear Phil Corso, I have search on control.com but not find. my question is that, my transformer...
Hussain, I suggest you search Control.com's Archives for Neutral Grounding or Neutral Earthing! ...
Topic: Engineering and workplace issues.
from the santan department...
Unit tripping in hydro generating station
Originally posted by moses wakatama on 26 January, 2010 - 7:25 am
in a hydro generating station of 6 x 125mw units, one unit is tripping
New Replies:
Wakataman... your query can't be answered with the wave of a magic-wand! You must provide detail! ...
Topic: Information resources, documentation.
from the Controls for converting a Frame 6 to Nat'l & #2 Fuel Oil department...
GE Frame 6 Dual Fuel Conversion
Originally posted by Terry Meikle on 24 May, 2007 - 12:35 am
I am investing ideas for the best control technology for converting a GE Frame 6B from Nat'l Gas to Dual Fuel and Black Start.
New Replies:
What was the cost to convert a GE Frame 6B DLN to dual fuel (oil)? Please feel free to call me...
Topic: Information resources, documentation.
from the Instrumentation department...
Gas turbine speed and electricity
Originally posted by G.Rajesh on 24 January, 2010 - 6:25 am
reducing the speed of gas turbine and still generate electricity by controlling the fuel flow
New Replies:
Thank you very much for your replies. Lot of doubts have been cleared. The way you answered the...
G.Rajesh, Remember, some of the first combustion (gas) turbines were used as engines for...
The turbine speed was not raised. Turbine speed is determined by the physical size of the unit....
Thank you, I agree with you GE has the purpose for that, I would like to know, If generator side...
NO! The MS6001B gas turbine is designed to operate at 5100 rpm. 3000 rpm is only 58.8% speed,...
Topic: PLCs and related questions.
from the Forum department...
GE Fanuc 90-30 power supply failures
Originally posted by Brian Hall on 22 January, 2010 - 3:19 pm
2 power supplies have failed in the last month. Anybody else having problems with these?
New Replies:
Hello Brian, I have also had several issues with these 90-30 Power Supplies and this was way...
As a field service Engineering Technician, I know this one, especially since having fixed a similar...
Topic: Power generation equipment control.
from the Forum department...
GT Initial load
Originally posted by iqbal on 22 January, 2010 - 7:27 am
Can I reduce the initial load settings on the gas turbine in markV?
New Replies:
You're very welcome, and thank you for the feedback! LK90SPMN is a minimum limit on the setpoint...
Dear Iqbal, We are running two frame- 9E and three frame-6B machines. LK90PSMN it mean that...
Thanks Brian....
Thanks a lot CSA. You are right. Operator can reduce the load after synchronisation. We did that...
I'm not familiar with the Hitachi CT but on the GE 7f turbines with MK5 controllers there is a...
I'm nervous about replying to this one because I don't know the turbine (heavy duty or...
Topic: Engineering and workplace issues.
from the Forum department...
Acceleration till 85% of THN
Originally posted by Antony on 15 January, 2010 - 6:01 am
At the last start up our frame V gas turbine reached 85% of speed (TNH) and it couldn't reach 100%
New Replies:
By V.Venkatachallam on 23 January, 2010 - 2:49 am -
I would suggest an operations point of view to be initially looked at! If your earlier startups...
Topic: Engineering and workplace issues.
from the controm department...
mark6 alarm and logger problem
Originally posted by abdalla on 17 December, 2009 - 5:55 am
Mark6 alarm and logger events not working
New Replies:
Open Internet explorer, type local host and confirm if the page is correctly loaded. Click and...
Topic: Power generation equipment control.
from the Simulation department...
Steam Turbine Speed Controller
Originally posted by kuldeep on 13 January, 2010 - 3:51 am
How Steam Turbine Speed Controller works?
New Replies:
Hi all, from what I can gather, it seems that our friend has a compressor which is driven from...
Hello, What I understand is your compressor will be driven by Motor and for some reason you...
Topic: Power generation equipment control.
from the Control Systems department...
DNP3 comm protocol and Foxboro DCS
Originally posted by LGAEC on 21 January, 2010 - 4:59 pm
Has anyone had any experience with a TAPCON 250 Load Tap Changer and a Foxboro DCS
New Replies:
why don't you use OPC? it's cheaper and you won't locked to vendors.. All you need for this to work...
Topic: Power generation equipment control.
from the DCS department...
ALSPA P320
Originally posted by SHR on 22 March, 2009 - 8:14 am
ALSPA P320 Documentation are required.
New Replies:
Information on this page (and others): ...
Hello, and what about presentations of the system itself. I'm very interested to learn about the...
Hi, Let me introduce myself : I am in charge of the Helpdesk department of Alstom Customer...
Topic: Human-Machine Interface and SCADA.
from the Mark V department...
Mark V Viewer Blank
Originally posted by ARIFIN PKC on 21 January, 2010 - 5:23 am
HMI Viewer blank not connected with HMI Server
New Replies:
If the only thing done was to install a new driver on the CPU being used for the HMI Viewer for an...
Topic: Power generation equipment control.
from the Forum department...
Transformer harmonics
Posted by Eric on 21 January, 2010 - 4:24 am
Comparison of harmonics on 21kV/690V (~4000kVA) trafos in accordance to the norm IEC 61000-2-4
Topic: Power generation equipment control.
from the Process department...
Mark V Control sequence
Originally posted by Denice Thomas on 19 January, 2010 - 6:11 pm
Mark V Control sequence definitions for Q -TBQB and Q -QTBA
New Replies:
Actually, I mis-spoke. My what a difference a letter can make; sorry, I haven't worked on a Mark...
Thank you very much....
Topic: Power generation equipment control.
from the IMD department...
Mark-VIe Vibration Protection Block
Originally posted by MGJ on 20 January, 2010 - 6:30 am
How to read the Vibration protection Block
New Replies:
The IMD Department? ? You should have received a Control Specification drawing with the Mark IV...
Select Page: Previous 3 4 5 6 7 8 9 10 11 12 13 Next
 
 

Your use of this site is subject to the terms and conditions set forth under Legal Notices and the Privacy Policy. Please read those terms and conditions carefully. Subject to the rights expressly reserved to others under Legal Notices, the content of this site and the compilation thereof is © 1999-2010 Nerds in Control, LLC. All rights reserved.

Users of this site are benefiting from open source technologies, including PHP, MySQL and Apache. Be happy.


Fortune
Democracy is a government where you can say what you think even if you
don't think.
Advertise here
Advertisement
our advertisers
Help keep our servers running...
Patronize our advertisers!
Visit our Post Archive