Hello guys,
I am working on MC15-M2 excitation system and I want to understand that in manual mode how to control the load for example we have to perform a test in which we start at 5 MW with other Generators running and then go in steps for further loading till full load so can we do this in Manual mode or it is only to be done in AVR mode.I could not find this in manual
I am working on MC15-M2 excitation system and I want to understand that in manual mode how to control the load for example we have to perform a test in which we start at 5 MW with other Generators running and then go in steps for further loading till full load so can we do this in Manual mode or it is only to be done in AVR mode.I could not find this in manual